Speed Compliance Analytics Engine

Look first.
Then leap.

Every locomotive run, read end to end โ€” against its caution order, its section limits, the signals it passed and the curve it should have braked on.

Journeys prepared
โ€”
Ready to review
โ€”
Stations on track
โ€”
Cautions refreshed
โ€”

One run, fully read

This is a real run. Every mark on it is evidence you can point at. Tap a number to see what it means.

The SCAE speed chart for one run

What every run is checked against

Five questions, answered the same way for every train, every time.

Speed against the effective limit

Section limit, or the caution limit where a restriction applies โ€” with your own tolerance band. Anything over is marked, timed and located to the metre.

Signals passed at yellow

A single yellow means the starter ahead is at danger. Each passage is listed with the aspect, the time it was given, and the speed it was passed at.

Home โ†’ starter deceleration

The approach is plotted against the standard braking curve, read as distance still to run โ€” and against where the train actually came to stand.

Brake tests at take-charge

Brake feel and brake power tests are detected from the speed trace at each take-charge and graded against the rule.

Which caution actually applied

Not every restriction binds every train. Line, direction and active window are resolved so a run is judged only by the orders in force for it.

Who was on the controls

Crew is split by hand-to-hand leg, so a finding attaches to the loco pilot who was actually driving that stretch.

The verdict

The answer first, the evidence underneath

Four lamps at the top of every run: speed, cautions, brake tests, signals. Green or amber, with the count that earned it. The detail is always one scroll away โ€” but you never have to dig for the finding.

Verdict lamps for a run Run summary figures
Signals passed at yellow

Every caution aspect, with the speed it was taken at

Read from station track events and matched to the run by direction โ€” the aspect the signal showed, when it was given, when it was passed, and how fast.

Table of signals passed at yellow
Deceleration

How the train stopped at each signal at danger

The actual approach against the standard curve, plotted as distance still to run โ€” and a line per station showing where it came to stand.

Deceleration profile against the standard curve
Point detail

Any point on the run, in full

Pin a point and read it: speed, the limit it was held to, the caution in force, and the signal aspect at that moment โ€” shown as the lamps themselves.

Home signal detail showing the aspect lamps

It ends in paper

Findings are only useful if they survive the walk to a counselling room. Every run prints as a proper A4 document โ€” run report, exceptions, a 1 mm : 100 m strip appendix, and a counselling slip for the loco pilot.

Printed A4 run report

The rest of the system

The dashboard is one of four surfaces. They share the same data and the same language.

Train status โ†’

What downloaded, what is partial, what is still waiting โ€” and why.

Caution orders โ†’

Every caution in force at a chosen date and time, as captured.

Crew working โ†’

Who worked which train, from where to where, leg by leg.

Pick a train. Read the run.

Sign in โ†’

Crew and loco inspectors are enrolled by the administrator.
Officers without an account can request access.